Pellet Plant Capacity: 1.0 Tonnes Per Hour (TPH)

Summary: For a pellet plant with a capacity of 1.0 TPH, the total connected load is 216.0 kW. A power connection of 150.0 kW (170.0 kVA) from the local distribution company (DISCOM) is required. The approximate cost for the electrical setup, including the transformer, substation, power cables, and distribution panel, is Rs. 11.00 Lakhs. Additional security deposits may be required by the local DISCOM.


Pellet Plant Capacity: 2.0 Tonnes Per Hour (TPH)

Summary: For a pellet plant with a capacity of 2.0 TPH, the total connected load is 323.0 kW. A power connection of 226.0 kW (250.0 kVA) from DISCOM is required. The approximate cost for the electrical setup, including the transformer, substation, power cables, and distribution panel, is Rs. 16.00 Lakhs. Additional security deposits may be required by the local DISCOM.


Pellet Plant Capacity: 3.0 Tonnes Per Hour (TPH)

Summary: For a pellet plant with a capacity of 3.0 TPH, the total connected load is 421.0 kW. A power connection of 290.0 kW (322.0 kVA) from DISCOM is required. The approximate cost for the electrical setup, including the transformer, substation, power cables, and distribution panel, is Rs. 20.00 Lakhs. Additional security deposits may be required by the local DISCOM.


Pellet Plant Capacity: 4.0 Tonnes Per Hour (TPH)

Summary: For a pellet plant with a capacity of 4.0 TPH, the total connected load is 600.0 kW. A power connection of 421.0 kW (470.0 kVA) from DISCOM is required. The approximate cost for the electrical setup, including the transformer, substation, power cables, and distribution panel, is Rs. 28.00 Lakhs. Additional security deposits may be required by the local DISCOM.


Pellet Plant Capacity: 8.0 Tonnes Per Hour (TPH)

Summary:

For a pellet plant with a capacity of 8.0 TPH, the total connected load is 1200.0 kW. A power connection of 843.0 kW (1338.0 kVA) from the local DISCOM is required. The approximate cost for the complete electrical setup, including the transformer, substation, power cables, and distribution panel, is Rs. 50.00 Lakhs. Additional security deposits may also be required by the local DISCOM.


Pellet Plant Capacity: 12.0 Tonnes Per Hour (TPH)

Summary:

For a pellet plant with a capacity of 12.0 TPH, the total connected load is 2078.0 kW. A power connection of 1455.0 kW (2309.0 kVA) from the local DISCOM is required. The approximate cost for the complete electrical setup, including the transformer, substation, power cables, and distribution panel, is Rs. 89.00 Lakhs. Additional security deposits may be required by the local DISCOM.


Capacity-Wise Electrical Power Requirement and Cost Table

Pellet Plant Capacity (TPH)

Total Connected Load (kW)

Power Connection from DISCOM (kW)

Power Connection from DISCOM (kVA)

Approx. Cost (Lakhs)

1.0

221.0

150.0

170.0

Rs. 11.00

2.0

360.0

250.0

277.0

Rs. 19.00

3.0

460.0

320.0

355.0

Rs. 23.00

4.0

633.0

440.0

490.0

Rs. 32.00

8.0

1200.0

843.0

1338.0

Rs. 50.00

12.0

2078.0

1455.0

2309.0

Rs. 89.00



Note: The above costs include the price of step-down power transformers (from 11 kV to 415V), air circuit breakers (ACBs), molded case circuit breakers (MCCBs), MCBs, fuses, switches, APFC control panels, and cables. These costs are approximate and based on a standard design layout. For exact pricing, please contact your power transformer and electrical panel supplier.