SERVODAY's Containerized PELLETBOX Pellet Plants offer an innovative solution for biomass pellet production, tailored to various production capacities. This guide provides a comprehensive analysis of the land requirements and associated costs for different production capacities of SERVODAY's PELLETBOX Pellet Plants, ensuring efficient space utilization and cost-effective setup.
Pellet Plant Capacity: 1.0 Tonnes Per Hour (TPH)
Per Day Production: 20.0 Tonnes (Considering 20 Hours uptime)
Containerized Unit Setup
The SERVODAY PELLETBOX Pellet Plant's containerized design negates the need for a building, as all crucial machinery is housed within the container units.
- Open Leveled Area: 18.0 Meters Length x 10.0 Meters Width
- Total Area: 180.0 Square Meters
- Civil Foundation Cost: No cost
Raw Material Preparatory Machinery and Storage
A semi-covered dome-type roofing is necessary for housing raw material preparatory machinery and storage.
- Size: 12.0 Meters Length x 8.0 Meters Width
- Total Area: 96.0 Square Meters
- Storage Capacity: 60.0 - 100 Tonnes
- Approximate Building Cost: Rs. 7.50 Lakhs
Open Storage for Raw Materials (If Required)
Open area for raw material unloading and storage.
- Size: 12.0 Meters Length x 10.0 Meters Width
- Total Area: 120.0 Square Meters
- Storage Capacity: 100.0 - 140 Tonnes
Pellet Plant Capacity: 2.0 Tonnes Per Hour (TPH)
Per Day Production: 40.0 Tonnes (Considering 20 Hours uptime)
Containerized Unit Setup
The SERVODAY PELLETBOX design ensures all critical machinery fits within the container units, requiring no additional building.
- Open Leveled Area: 18.0 Meters Length x 10.0 Meters Width
- Total Area: 180.0 Square Meters
- Civil Foundation Cost: No cost
Raw Material Preparatory Machinery and Storage
A semi-covered dome-type roofing is necessary for raw material machinery and storage.
- Size: 12.0 Meters Length x 8.0 Meters Width
- Total Area: 96.0 Square Meters
- Storage Capacity: 60.0 - 100 Tonnes
- Approximate Building Cost: Rs. 7.50 Lakhs
Open Storage for Raw Materials (If Required)
Open area designated for unloading and storing raw materials.
- Size: 12.0 Meters Length x 10.0 Meters Width
- Total Area: 120.0 Square Meters
- Storage Capacity: 100.0 - 140 Tonnes
Pellet Plant Capacity: 3.0 Tonnes Per Hour (TPH)
Per Day Production: 60.0 Tonnes (Considering 20 Hours uptime)
Containerized Unit Setup
The containerized unit houses all necessary machinery, eliminating the need for a separate building.
- Open Leveled Area: 18.0 Meters Length x 20.0 Meters Width
- Total Area: 360.0 Square Meters
- Civil Foundation Cost: No cost
Raw Material Preparatory Machinery and Storage
A semi-covered dome-type roofing for machinery and storage is required.
- Size: 16.0 Meters Length x 12.0 Meters Width
- Total Area: 192.0 Square Meters
- Storage Capacity: 170.0 - 250 Tonnes
- Approximate Building Cost: Rs. 15.00 Lakhs
Open Storage for Raw Materials (If Required)
An open area for unloading and storing raw materials is necessary.
- Size: 20.0 Meters Length x 20.0 Meters Width
- Total Area: 400.0 Square Meters
- Storage Capacity: 360.0 - 500 Tonnes
Pellet Plant Capacity: 4.0 Tonnes Per Hour (TPH)
Per Day Production: 80.0 Tonnes (Considering 20 Hours uptime)
Containerized Unit Setup
All essential machinery fits within the container units, eliminating the need for an additional building.
- Open Leveled Area: 18.0 Meters Length x 20.0 Meters Width
- Total Area: 360.0 Square Meters
- Civil Foundation Cost: No cost
Raw Material Preparatory Machinery and Storage
A semi-covered dome-type roofing for raw material preparatory machinery and storage is required.
- Size: 16.0 Meters Length x 12.0 Meters Width
- Total Area: 192.0 Square Meters
- Storage Capacity: 170.0 - 250 Tonnes
- Approximate Building Cost: Rs. 15.00 Lakhs
Open Storage for Raw Materials (If Required)
Open area for raw material unloading and storage is essential.
- Size: 20.0 Meters Length x 20.0 Meters Width
- Total Area: 400.0 Square Meters
- Storage Capacity: 360.0 - 500 Tonnes
Conclusion
SERVODAY’s Containerized PELLETBOX Pellet Plants provide a highly efficient and cost-effective solution for biomass pellet production, accommodating various production capacities while minimizing land and infrastructure requirements. By leveraging SERVODAY’s expertise in designing and supplying pellet plants, clients can achieve optimal production efficiency and cost savings. For more information on specific tenders and procurement opportunities, visit our website and explore the detailed options available for your biomass pellet project needs.